1. Return to Search Page >> 2. Search Results >> 3. Planning Application Detail
Details of Planning Application - BDB/68407
Application DetailsDocumentsConsultation
Application registeredConsultation periodAwaiting decisionDecidedAppealAppeal decided
Application Type:Full planning permission
Date Received:25/03/2008
Registration Date:25/03/2008
Consultation Start Date:25/03/2008
Earliest Decision Date:23/06/2008
Target Date for Decision:24/06/2008
Location:Land At Nash's Field Os Pt 1431 Su 6745, Old A339 Southrope, Herriard
Ward Name:Upton Grey and The Candovers
Parish Name:Herriard
Conservation Area:Not available
Listed Building Grade:Not available
Environmental Assessment:Not required
Target Recommendation Date:No date
Expected Decision Level:Delegated
Easting/Northing:467137/145334
Statutory Class:Other Small Scale developments
Proposal:Erection of 2 no. five bedroom and 1 no. four bedroom detached dwellings, garages and stables. Erection of a pavilion with associated landscaping and recreational facilities
Case Officer:Sue Tarvit
Case Officer Tel:01256 845241
Case Officer Email:sue.tarvit@basingstoke.gov.uk
Status:Decided
Agent:Mr R V M Gandy
64 Portsmouth Road
Guildford
GU2 4DU
Applicant:Mr J T L Jervoise
Bewley Homes Plc
Inhursy House
Brimpton Road
Baughurst
RG26 5JJ
Press Date: 04/04/2008
Site Notice Date: 02/04/2008
NeighboursResponses Received: 3
and Representatives:In Favour: 3
Click here for a listAgainst: 0
Petitions: 0
Comments: 0
Officer Site Visit Date:12/05/2008
Committee Site Visit Date:No date
Committee Meeting Date: No date
Decision Level:Delegated
Date Decision Made:24/06/2008
Date Decision Despatched:24/06/2008
Decision:Granted
Conditions or Reasons:View Conditions or Reasons
Informative Notes:
1) To fulfil condition 3, the applicant will need to include the following amendments to the Arboricultural Method Statement reference 08008AMS dated May 2008 submitted by Tree Management Consultants. Clarify the timing of the construction of the non-dig section of the access for the three proposed dwellings and the tree protection measures for the adjacent boundary trees. b) Include details for the construction for the proposed footpath link through the existing vegetation on the south-east boundary.To fulfil condition 3, the applicant will need to include the following amendments to the Arboricultural Method Statement reference 08008AMS dated May 2008 submitted by Tree Management Consultants.
Clarify the timing of the construction of the non-dig section of the access for the three proposed dwellings and the tree protection measures for the adjacent boundary trees.
b) Include details for the construction for the proposed footpath link through the existing vegetation on the south-east boundary.
2) 1.1 The applicants attention is drawn to the fact that the above conditions (if any), must be complied with in full, failure to do so may result in enforcement action being instigated. 1.2 This permission may contain pre-commencement conditions which require specific matters to be submitted and approved in writing by the Local Planning Authority before a specified stage in the development occurs. This means that a lawful commencement of the approved development CANNOT be made until the particular requirements of the pre-commencement conditions have been met. 1.3 The applicants attention is drawn to the fact that the Local Planning Authority has a period of up to eight weeks to determine details submitted in respect of a condition or limitation attached to a grant of planning permission. It is likely that in most cases the determination period will be shorter than eight weeks, however, the applicant is advised to schedule this time period into any programme of works. A fee will be required for requests for discharge of any consent, agreement, or approval required by a planning condition. The fee chargeable is £85 per request or £25 where the related permission was for extending or altering a dwelling house or other development in the curtilage of a dwelling house. A fee is payable for each submission made regardless of the number of conditions for which approval is sought. Requests must be made using the standard application form (available online) or set out in writing clearly identifying the relevant planning application and condition(s) which they are seeking approval for.1.1 The applicants attention is drawn to the fact that the above conditions (if any), must be complied with in full, failure to do so may result in enforcement action being instigated.

1.2 This permission may contain pre-commencement conditions which require specific matters to be submitted and approved in writing by the Local Planning Authority before a specified stage in the development occurs. This means that a lawful commencement of the approved development CANNOT be made until the particular requirements of the pre-commencement conditions have been met.

1.3 The applicants attention is drawn to the fact that the Local Planning Authority has a period of up to eight weeks to determine details submitted in respect of a condition or limitation attached to a grant of planning permission. It is likely that in most cases the determination period will be shorter than eight weeks, however, the applicant is advised to schedule this time period into any programme of works. A fee will be required for requests for discharge of any consent, agreement, or approval required by a planning condition. The fee chargeable is £85 per request or £25 where the related permission was for extending or altering a dwelling house or other development in the curtilage of a dwelling house. A fee is payable for each submission made regardless of the number of conditions for which approval is sought. Requests must be made using the standard application form (available online) or set out in writing clearly identifying the relevant planning application and condition(s) which they are seeking approval for.
3) Where disposal of surface water is other than to a public sewer then the applicant should ensure that approval for the discharge has been obtained from the appropriate Authority.Where disposal of surface water is other than to a public sewer then the applicant should ensure that approval for the discharge has been obtained from the appropriate Authority.
4) Details of the minor alterations required to the submitted landscaping scheme can be obtained from the case officer.Details of the minor alterations required to the submitted landscaping scheme can be obtained from the case officer.
5) 1.1 The applicants attention is drawn to the fact that the above conditions (if any), must be complied with in full, failure to do so may result in enforcement action being instigated. 1.2 This permission may contain pre-commencement conditions which require specific matters to be submitted and approved in writing by the Local Planning Authority before a specified stage in the development occurs. This means that a lawful commencement of the approved development CANNOT be made until the particular requirements of the pre-commencement conditions have been met. 1.3 The applicants attention is drawn to the fact that the Local Planning Authority has a period of up to eight weeks to determine details submitted in respect of a condition or limitation attached to a grant of planning permission. It is likely that in most cases the determination period will be shorter than eight weeks, however, the applicant is advised to schedule this time period into any programme of works. A fee will be required for requests for discharge of any consent, agreement, or approval required by a planning condition. The fee chargeable is £85 per request or £25 where the related permission was for extending or altering a dwelling house or other development in the curtilage of a dwelling house. A fee is payable for each submission made regardless of the number of conditions for which approval is sought. Requests must be made using the standard application form (available online) or set out in writing clearly identifying the relevant planning application and condition(s) which they are seeking approval for.1.1 The applicants attention is drawn to the fact that the above conditions (if any), must be complied with in full, failure to do so may result in enforcement action being instigated.

1.2 This permission may contain pre-commencement conditions which require specific matters to be submitted and approved in writing by the Local Planning Authority before a specified stage in the development occurs. This means that a lawful commencement of the approved development CANNOT be made until the particular requirements of the pre-commencement conditions have been met.

1.3 The applicants attention is drawn to the fact that the Local Planning Authority has a period of up to eight weeks to determine details submitted in respect of a condition or limitation attached to a grant of planning permission. It is likely that in most cases the determination period will be shorter than eight weeks, however, the applicant is advised to schedule this time period into any programme of works. A fee will be required for requests for discharge of any consent, agreement, or approval required by a planning condition. The fee chargeable is £85 per request or £25 where the related permission was for extending or altering a dwelling house or other development in the curtilage of a dwelling house. A fee is payable for each submission made regardless of the number of conditions for which approval is sought. Requests must be made using the standard application form (available online) or set out in writing clearly identifying the relevant planning application and condition(s) which they are seeking approval for.
Appeal Received Date:This case has no appeals against it
Planning Obligation Status:Not available
Unfortunately, the consultation period for this application is not open. Please contact the case officer directly if you have any questions.

Return to Search PageTop of Page